
Disclosure: NOXI publishes this guide and is one of the tools it mentions. Every layout below works on paper, in PowerPoint, Word, Google Docs or Google Slides, and none of them needs NOXI.
Timeline template: a time axis, dated events in order, a short label on each, and a title naming the period. Below are 10 layouts, each with a filled example: project, Gantt-style, milestone, product roadmap, history, biography, comparison, vertical, school and event day. Pick by what you show: work ahead, the past, a class or one day. Checked 9 November 2026.
A timeline works when the reader finds two things in a second: where it starts and ends, and which event matters most. The filled examples use fictional companies and people, labelled as such, or dated historical facts from official pages named in the sources.
In short
- The partsA title with the period, a time axis with a stated scale, dated events with short labels, lanes or phases where groups matter, and a source line.
- 10 layoutsPlan work: project, Gantt-style, milestone, product roadmap. Tell the past: history, biography, comparison, vertical. A class or a day: school, event day.
- DirectionHorizontal for a slide or poster with a handful of events; vertical for documents, phones and long lists.
- ScaleEqual spacing for steps in a plan; spacing to scale when the gaps carry the story, as in the 72 years from Seneca Falls to ratification of the 19th Amendment [2] [3].
- DatesOne format from start to finish. The GOV.UK style guide writes 4 June 2017 and uses "to" in ranges, not dashes [11].
- ToolsSmartArt timelines in Word and PowerPoint [6], a timeline view in Google Sheets [7], a drawing in Google Docs [8] and diagrams in Google Slides [9].
Pick your layout here, then jump to its template and filled example.
| # | Layout | Best for | Direction | Filled example on this page |
|---|---|---|---|---|
| 1 | Project | A team plan with phases and sign-offs | Horizontal | Bakery website relaunch, 12 weeks (fictional) |
| 2 | Gantt-style | Tasks that overlap, with owners | Horizontal bars | Dental practice office move, 8 weeks (fictional) |
| 3 | Milestone | Boards and executives who want the dates that matter | Horizontal | Cargo e-bike launch, 2027 (fictional) |
| 4 | Product roadmap | Direction by quarter and theme | Lanes by quarter | Note-taking app, 2027 (fictional) |
| 5 | History | A period with uneven gaps | Horizontal, to scale | Votes for women in the US, 1848 to 1920 |
| 6 | Biography | One life, from birth to legacy | Horizontal or vertical | Katherine Johnson, 1918 to 2020 |
| 7 | Comparison | Two sides on one time axis | Two lanes | Space Race firsts, 1957 to 1983 |
| 8 | Vertical | Many entries, documents and phones | Vertical | Apollo 11, 16 to 24 July 1969 |
| 9 | School | Young students and class projects | Horizontal, with picture boxes | A "my life" timeline (fictional child) |
| 10 | Event day | One day by the hour | Vertical run of show | A wedding day (fictional couple) |

Key numbers
Six figures behind the layouts and examples on this page, each from its publisher's own page, opened on 9 November 2026.
Which timeline template fits: six quick routes
Six routes, one per need, each with the fact that makes it fit, checked on 9 November 2026.
- If you already work in Word or PowerPoint → use SmartArt: Insert, SmartArt, Process, then Basic Timeline or Circle Accent Timeline, because Microsoft's help page names both as timeline layouts and lets you add a date with Add Shape Before or After [6].
- If your dates already sit in a spreadsheet → use Google Sheets' timeline view (Insert, Timeline) with layout 2, because Sheets turns each row into a card and can group cards by owner; Google lists it only for certain Workspace editions, such as Business Standard and Education Plus, so check yours [7].
- If you write in Google Docs → use layout 8 as a two-column table, or draw a line with Insert, Drawing, New, which offers shapes, arrows and text boxes [8].
- If you teach five to seven year olds → use layout 9, the "my life" timeline, because England's Key Stage 1 history asks pupils to study "changes within living memory" and to place events "within a chronological framework" [10].
- If two countries, people or plans race each other → use layout 7, two lanes on one axis, and print the gap between each pair of dates, as in the Space Race example below.
- If you want the timeline page sketched and designed for you → use NOXI's Presentation or One-pager format: you send one request with your dates and events, edit by chat or by hand, and export PowerPoint, PDF or Word; the free plan covers five documents a month.
What is a timeline template? The five parts of every timeline
The idea is old: Priestley's 1765 chart already sorted its lives into six occupational groups, lanes in all but name, along a line divided into ten-year steps [1]. Every layout below still has the same five parts.
| Part | What goes in it | The usual mistake |
|---|---|---|
| Title and period | What the timeline covers and when: "Votes for women in the US, 1848 to 1920" | A title with no dates |
| Axis and scale | Hours, days, weeks, quarters or years; equal spacing or spacing to scale, and which one | Changing the scale halfway without marking the break |
| Events | A date as precise as the source gives, and a label of three to eight words | Full paragraphs on the line itself |
| Lanes or phases | Groups the reader needs to tell apart: teams, countries, themes, project phases | More lanes than anyone can follow |
| Key and source | What each colour or symbol means, the version date, where the dates come from | No source on a history timeline, no "as of" date on a plan |
How to make a timeline in six steps
These steps work on paper and in any program; the tool only changes step 4.
1. Decide the one question the timeline answers
"When will the site go live?" or "How long did women wait for the vote?" One question decides the period, the scale and which events earn a place. It becomes the title.
2. List the events in a table before you draw anything
Four columns: date, event, one line of detail, source. Sort by date. A table catches events in the wrong order and dates with no source, and every tool on this page can draw from it [6] [7].
3. Choose the scale and the direction
Equal spacing when events are steps, spacing to scale when the gaps are the point. Horizontal for a slide or a poster; vertical for a document, a phone or more entries than fit across.
4. Draw the line and place the events
Put the line across the middle of a slide or down the left third of a page. Alternate labels above and below a horizontal line so they do not collide.
5. Mark the one event that matters most
One accent colour for the turning point, today or the deadline, plus a word, because colour should not be "the only visual means" of carrying information [19].
6. Check every date against its source and add the source line
History cites an official or encyclopaedic page; a plan cites its current version. If two sources disagree, show the range or add a note.
Project timeline templates: project, Gantt-style, milestone and roadmap
Four layouts for work ahead, by how much detail the reader needs: the whole plan (1), every task (2), only the results (3), or the year's direction (4). All four examples use fictional companies.
1. Project timeline template: phases, sign-offs and dates
When to use it: a plan of one to six months whose phases run mostly one after another, for a team, client or sponsor. Why it works: each phase ends with a sign-off, so everyone sees what must be true before the next one starts. If tasks overlap heavily, use layout 2.
Project: [name] · Owner: [name] · [start date] to [end date] · Version of [date] Phase 1: [name], [start] to [end]. Ends with: [sign-off, and who gives it] Phase 2: [name], [start] to [end]. Ends with: [sign-off] Phase 3: [name], [start] to [end]. Ends with: [sign-off] Phase 4: [name], [start] to [end]. Ends with: [sign-off] Phase 5: [name], [start] to [end]. Ends with: [the go-live date] Today marker: [date] Biggest risk to the dates: [one line] Dates taken from: [plan or tracker, version, date]
Filled example: Harbor Lane Bakery (a fictional company) relaunches its website in 12 weeks, version of Monday 4 January 2027.
| Phase | Dates (2027) | Ends with |
|---|---|---|
| Discovery | Monday 4 January to Friday 15 January | Brief signed off by the owner, Friday 15 January |
| Design | Monday 18 January to Friday 5 February | Page designs approved, Friday 5 February |
| Build | Monday 8 February to Friday 5 March | Menu, photos and ordering pages complete, Friday 5 March |
| Test | Monday 8 March to Friday 19 March | Go or no-go meeting, Friday 19 March |
| Launch | Monday 22 March to Friday 26 March | Site live Tuesday 23 March; review Friday 26 March |
Tip: print the version date on the timeline itself, because a plan is out of date a week after it is shared. This is the slide a project kickoff presentation opens the plan with, and the one a weekly status report updates.
2. Gantt-style timeline template: tasks, owners and overlaps
When to use it: projects whose tasks overlap and depend on each other, such as a move or a product release. Why it works: each task is a bar across a row of weeks, so overlaps and the task everything waits for show without reading a word.
Title: [project], [start date] to [end date] · Version of [date] Columns on the left: Task · Owner · Depends on Calendar across the top: [week 1 to week N, with the Monday date of each week] One row per task, in the order work starts Bar: from the task's first week to its last; a diamond for a one-day milestone Colour: by owner or by status, never both Today: a vertical line through every row
Filled example: Brightwater Dental (a fictional practice) moves to a new office in 8 weeks, from Monday 1 February to Friday 26 March 2027.
| Task | Owner | Weeks | Depends on |
|---|---|---|---|
| 1. Lease signed, floor plan fixed | Practice manager | 1 to 2 | Nothing |
| 2. Dental chairs and X-ray unit ordered and delivered | Operations lead | 2 to 5 | Task 1 |
| 3. Fit-out: wiring, plumbing, paint | Building contractor | 3 to 6 | Task 1 |
| 4. Phones, network and booking system | IT partner | 5 to 6 | Task 3 |
| 5. Patients told, listings updated | Front desk | 5 to 7 | Task 1 |
| 6. Equipment installed and checked | Operations lead with the supplier | 7 | Tasks 2 and 3 |
| 7. Move on Saturday 20 March, first patients Monday 22 March | Whole team | 7 to 8 | Tasks 4, 5 and 6 |
Tip: keep these columns in a spreadsheet and the timeline draws itself: Google Sheets' timeline view takes a card title, a start date and an end date, and can group one owner's tasks on one row [7].

3. Milestone timeline template: only the dates that matter
When to use it: a board meeting, an investor update or a one-minute summary for executives. Why it works: it drops the tasks and keeps four to seven results with a status, so the reader sees in seconds whether the plan is on track.
Title: [project] milestones, [year] · Version of [date] For each milestone, in date order: [date] · [a result, not an activity: "suppliers signed", not "supplier talks"] · [status: done, on track or at risk] · [owner] Today marker: [date] Under the line: [the one decision you need from this audience, if any]
Filled example: Tallis Bikes (a fictional company) takes a cargo e-bike from prototype to first customers in 2027.
| Date (2027) | Milestone | Status |
|---|---|---|
| Friday 26 February | Prototype passes the team's 1,000 km ride test | Done |
| Friday 30 April | Frame and battery suppliers signed | On track |
| Wednesday 30 June | 20 pilot bikes riding with three delivery partners | On track |
| Wednesday 15 September | First 200 bikes built | At risk: battery lead time |
| Monday 1 November | First customer deliveries | On track |
Tip: one at-risk milestone with its reason earns more trust than five green ones. Investor decks often carry this layout as a milestones or traction slide; our pitch deck examples show where it sits in real decks.
4. Product roadmap timeline template: themes by quarter
When to use it: sharing a product's direction with customers, leadership or the whole company. Why it works: it stops at quarters, because a date nine months out is a guess, and groups work by theme. For outside readers, name the months: the GOV.UK style guide prefers "Jan to Mar 2013" to a quarter [11].
Title: [product] roadmap, [year] · Version of [date] Columns: [Jan to Mar] · [Apr to Jun] · [Jul to Sep] · [Oct to Dec] Lanes: [theme 1] · [theme 2] · [theme 3] In each cell: an outcome in three to six words, not a feature list Confidence: firm for the next quarter, likely for the one after, exploring beyond that Not this year: [two things you decided not to do]
Filled example: Lumen Notes (a fictional note-taking app), roadmap for 2027.
| Theme | Jan to Mar (firm) | Apr to Jun (likely) | Jul to Sep (exploring) | Oct to Dec (exploring) |
|---|---|---|---|---|
| Mobile | Notes work offline on Android | Search results in under a second | Handwriting on tablets | Home screen widgets |
| Sharing | Share a notebook with one person | Shared notebooks for teams | Comments on any note | Read-only public links |
| Trust | Two-step sign-in for everyone | Export every note in one file | Version history for 90 days | Admin controls for schools |
Not this year: a desktop app and a calendar. That line stops the same request coming back every month. To present a roadmap to executives, our product roadmap presentation guide covers the decisions to ask for.
History timeline templates: history, biography, comparison and vertical
Four layouts for the past. Every date in these examples comes from the US National Archives, the National Park Service or NASA, opened on 9 November 2026; gaps between dates are our arithmetic.
5. History timeline template: a period drawn to scale
When to use it: a history class, a museum panel or a talk on a period in which the gaps matter. Why it works: to scale, one centimetre means the same number of years everywhere, so a long wait looks long. England's curriculum asks pupils from Key Stage 2 for "chronologically secure knowledge" of history [10].
Title: [topic], [first year] to [last year] Scale: 1 [centimetre or grid square] = [N] years. If one gap is far longer than the rest, break the line with a zigzag and say so Events (six to ten): [date, only as precise as the source] · [what happened, four to ten words] · [source] Above the line: [one strand, such as laws]; below the line: [another, such as people or protests] Zoom box: [a crowded stretch, drawn larger beside the line] Turning point: [one event], and one sentence on why it matters Sources: [each one, with the date you checked it]
Filled example: votes for women in the United States, 1848 to 1920.
| Date | Event | Source |
|---|---|---|
| 19 and 20 July 1848 | First Women's Rights Convention, Wesleyan Chapel, Seneca Falls, New York; 68 women and 32 men sign the Declaration of Sentiments | National Park Service [2] |
| 1869 | Wyoming Territory passes the Wyoming Suffrage Act | National Park Service [18] |
| 1878 | A woman suffrage amendment is first introduced in Congress | National Archives [3] |
| 1890 | Wyoming becomes a state, and its women keep the vote | National Park Service [18] |
| 1917 | New York adopts woman suffrage | National Archives [3] |
| 21 May 1919 | The House of Representatives passes the amendment | National Archives [3] |
| 4 June 1919 | The Senate follows, and the 19th Amendment has passed Congress | National Archives [3] |
| 18 August 1920 | Tennessee becomes the 36th state to ratify | National Archives [3] |
| 26 August 1920 | Secretary of State Bainbridge Colby certifies the ratification | National Archives [3] |
Tip: to scale, the first five events spread across 69 years and the last four crowd into 15 months. Do not shrink the labels: draw May 1919 to August 1920 again in a zoom box, as in the figure below. The Wyoming act stays "1869" because the source gives only the year [18].

6. Biography timeline template: one life, from birth to legacy
When to use it: a biography report, a "famous person" project or a tribute slide. Why it works: it keeps the life (dated facts) apart from the meaning (one sentence on why the person matters). For the written report around it, our book report template has a biography version with its own five-date timeline.
Person: [full name] · [born: date, place] · [died: date, if so] · Known for: [one line] Early life: [date] · [event] Education: [date] · [event] First job or turning point: [date] · [event] Major work: [two or three dates] · [what they did] Recognition: [date] · [award or honour] Legacy: one sentence, with no date Source: [the biography or official page, and the date you checked it]
Filled example: Katherine Johnson, NASA mathematician, from NASA's own biography [17].
| Date | Event |
|---|---|
| 26 August 1918 | Born in White Sulphur Springs, West Virginia |
| 1937 | Graduates with highest honors and takes a teaching job at a black public school in Virginia |
| June 1953 | Hired by NACA at its Langley laboratory, in the West Area Computing section led by Dorothy Vaughan |
| May 1961 | Does the trajectory analysis for Alan Shepard's Freedom 7, America's first human spaceflight |
| 1962 | At John Glenn's request, checks by hand the orbital equations the computers would use for his Friendship 7 flight |
| 1986 | Retires after 33 years at Langley |
| 2015 | Receives the Presidential Medal of Freedom from President Barack Obama, aged 97 |
| 24 February 2020 | Dies |
Legacy line: her calculations also helped the Apollo Lunar Module meet the Command and Service Module in lunar orbit, as NASA's biography notes [17]. Tip: when a source gives only a month or a year, keep it that way; "June 1953" is honest, an invented day is not.
7. Comparison timeline template: two lanes on one axis
When to use it: two countries, two people, two products, or a plan against what actually happened. Why it works: both lanes share one axis, so the reader sees who went first and by how much; the printed gap turns the picture into a fact.
Title: [A] and [B], [first year] to [last year] One time axis across the middle; lane A above it, lane B below it For each pair: [the stage or "first"] · [date in lane A] · [date in lane B] · [the gap, in days or years] Colour: one per lane, used in the key and nowhere else An event far outside the period: an arrow off the end of the axis with its date Takeaway: one sentence on what the gaps show
Filled example: Space Race firsts, Soviet Union and United States, with dates from NASA's history pages [4] [12] [13] [14] [15] [16]. The gaps are our arithmetic from those dates.
| First | Soviet Union | United States | Gap |
|---|---|---|---|
| Satellite | Sputnik 1, 4 October 1957 | Explorer 1, 31 January 1958 | 119 days |
| Person in space | Yuri Gagarin, a single orbit, 12 April 1961 | Alan Shepard, Freedom 7, suborbital, 15 minutes 22 seconds, 5 May 1961 | 23 days |
| Orbit of the Earth | Yuri Gagarin, 12 April 1961 | John Glenn, Friendship 7, three orbits, 20 February 1962 | 314 days |
| Woman in space | Valentina Tereshkova, Vostok 6, 48 orbits, 16 June 1963 | Sally Ride, Challenger mission STS-7, 18 June 1983 | 20 years and 2 days |
| Spacewalk | Aleksei Leonov, Voskhod 2, 18 March 1965 | Ed White, Gemini 4, 3 June 1965 | 77 days |
| People on the Moon | None | Neil Armstrong and Buzz Aldrin, Apollo 11, 20 July 1969 | United States only |
Tip: Sally Ride's flight comes 14 years after Apollo 11, so draw it as an arrow off the axis rather than stretching the line. For business, put the plan in the top lane, what happened below, and print each slip in days.

8. Vertical timeline template: many entries, read from top to bottom
When to use it: a document, a web page, a phone screen, a career history, or more entries than fit across a slide. Why it works: pages are read downwards, so a vertical line holds as many entries as the page allows, each with a full sentence.
Title: [what], [period] Left column: [date or time] · Centre: the line, with one dot per entry · Right column: [what happened, one sentence] Group headers on the line: [day 1, day 2] or [decade] One entry in the accent colour: [the moment that matters most] Footer: which clock or time zone the times use, and the source
Filled example: Apollo 11, 16 to 24 July 1969, in mission elapsed time (hours and minutes after launch), from NASA's mission overview [16].
| Mission time | What happened |
|---|---|
| 0 h 00 m (16 July, 9:32am EDT) | Launch, with Neil Armstrong, Buzz Aldrin and Michael Collins |
| About 75 h 50 m | Apollo 11 enters lunar orbit |
| 100 h 12 m | The lunar module Eagle undocks from the command module Columbia |
| About 102 h 45 m | The descent engine brings Eagle down to the surface |
| About 109 h 42 m | Armstrong steps onto the Moon; Aldrin follows about 20 minutes later |
| 111 h 39 m | The moonwalk ends, after more than two and a half hours |
| 124 h 22 m | Eagle's ascent engine fires to leave the Moon, after 21 hours 36 minutes on the surface |
| 128 h 03 m | Eagle docks with Columbia |
| 21 July | The engine burn that sends the spacecraft home begins |
| 24 July, 12:50pm EDT | Splashdown in the Pacific; the recovery ship is USS Hornet |
Tip: say which clock you use. NASA gives launch and splashdown in Eastern Daylight Time and the rest in mission time; from those two times the flight took 8 days, 3 hours and 18 minutes by our count. In Docs or Word, build this layout as a two-column table.
Timeline template for students and for event days
Two layouts for a class and for a single day. Both examples are fictional.
9. Timeline template for students: a "my life" timeline
When to use it: kindergarten to grade 3, or Key Stage 1 in England, and a child's first timeline. Why it works: Key Stage 1 history asks pupils to know "where the people and events they study fit within a chronological framework" and to study "changes within living memory" [10]; a child's own life is the period they remember best. Older students can use layout 5 or 6, with sources.
My Life Timeline · Name: [your name] · Age: [ ] Draw a line across the page. Put a box for each year, from the year you were born to this year. In each box: the year · what happened · a small drawing or a photo Ideas: I was born in [place] · I took my first steps · my brother or sister was born · I started school · I learned to [swim, ride a bike] · we moved to [place] · my best day this year Ask a grown-up to help you check the years.
Filled example: Leo, a fictional eight-year-old, in 2026.
| Year | What happened | Picture box |
|---|---|---|
| 2018 | I was born in Millbrook | A baby photo |
| 2019 | I took my first steps | Drawing of small shoes |
| 2021 | My sister Ava was born | Drawing of Ava |
| 2022 | I started school | My first school jumper |
| 2024 | I learned to swim | The swimming badge |
| 2026 | I joined the junior football team | Our team photo |
Tip: skip the quiet years, but keep the boxes in order. Teachers can fold it into a lesson with our lesson plan template; the same sheet works as a timeline template for kids at home.
10. Event day timeline template: one day by the hour
When to use it: a wedding, a conference, a school sports day or a launch day. Why it works: every time, place and person sits on one sheet, so the venue, suppliers and helpers work from the same page.
Event: [name] · [day and date] · Venue: [ ] · Contact on the day: [name and phone] Each row: [time] · [what happens] · [where] · [who leads] Fixed times first: [ceremony, keynote, meal]; then everything around them Buffer: [10 to 15 minutes] between moves from one room to another Last row: [finish time] · [who locks up or pays the final bill]
Filled example: Sam and Priya's wedding (a fictional couple), Saturday 12 June 2027.
| Time | What happens | Where | Who leads |
|---|---|---|---|
| 9am | Hair and make-up begins | Bridal suite | Stylist |
| 11:30am | Photographer arrives | Bridal suite | Photographer |
| 1pm | Guests arrive and are seated | Garden | Ushers |
| 1:30pm | Ceremony, 30 minutes | Garden | Celebrant |
| 2pm to 3:30pm | Drinks and six group photos | Lawn | Photographer, best man |
| 3:45pm | Guests called to dinner | Hall | Venue manager |
| 4pm | Dinner | Hall | Caterer |
| 6pm | Three speeches, five minutes each | Hall | Best man as host |
| 7:30pm | Evening guests arrive | Hall | Ushers |
| 8pm | First dance | Hall | DJ |
| 9:30pm | Evening food | Hall | Caterer |
| 11:30pm | Last song | Hall | DJ |
| Midnight | Taxis | Front drive | Venue manager |
Tip: write times one way only. The GOV.UK style guide writes 5:30pm, midday and midnight, and "10am to 11am" rather than a dash [11]. A conference day uses the same layout; our meeting agenda template covers the timed agenda for each session.
Timeline template for PowerPoint, Word and Google Docs
Every layout above starts as a table, so it moves into any of these tools. Steps are from each vendor's help page, opened on 9 November 2026.
In PowerPoint and Word: SmartArt timelines
On the Insert tab, choose SmartArt, then the Process category, then Basic Timeline or Circle Accent Timeline on Windows, or Basic Timeline on a Mac. Type into the placeholders or the Text Pane. To add a date, select a shape and use Add Shape Before or After on the SmartArt Design tab; Move Up and Move Down change the order on Windows, Move Before and Move After on a Mac. For photos, Microsoft suggests Continuous Picture List [6]. New PowerPoint presentations open at 16:9 Widescreen, 13.333 x 7.5 inches, which suits a horizontal line [5].
In Google Docs: a drawing or a table
Click Insert, Drawing, New, then add a line or an arrow, a shape per event and text boxes for the labels. A drawing made in Google Drive can be inserted with Insert, Drawing, From Drive; it stays linked to the original, and Update brings in later changes [8]. For layouts 8 and 10, a table with the date on the left and the event on the right is quicker to make and to edit.
In Google Slides: a diagram
Go to the slide, click Insert, then Diagram, and choose a style, the number of levels and a template; the diagram lands on the slide for you to change [9]. Pick a left-to-right style and type your dates in.
In Google Sheets and Excel: from a table of dates
In Google Sheets, click Insert, then Timeline, select the data range and click OK. Each row becomes a card with a title, start date and end date, and card group puts one owner's or one country's cards on the same row: lanes for layouts 2 and 7. Google's page lists the eligible Workspace editions, so check yours [7]. Excel has the same SmartArt timeline on its Insert tab [6].
Turning a timeline into a whole talk? Our guide on how to make a presentation walks through the slides around it.
Dates, scale and labels: getting a timeline right
- One date format. The GOV.UK style guide writes 4 June 2017, with no "4th" and no comma, Jan only where space is tight, and "to" in ranges instead of a dash [11]. A US audience may expect June 4, 2017; either works if it never changes.
- Only as precise as the source. A year stays a year, and times name their clock or zone, as NASA does for Apollo 11 [16].
- State the scale. Equal spacing for steps, to scale for history, and a visible break where you shorten a long gap.
- Colour plus a word. Label lanes and status as well as colouring them [19].
What to check before you present or send a timeline
Each line takes a minute.
- Every date matches its source.History: the page you cite. Work: the current plan, not last month's copy.
- Sources that disagree are shown.If two pages differ by a day, give the range or a short note.
- The version date is on the page.Plans and roadmaps carry "version of [date]" on every copy.
- Fictional examples are labelled or replaced.Sample companies and people never pass as real.
- Company policy allows it.Roadmaps and launch dates shared outside may need approval; check your company's rules first.
- The school's rules come first.The teacher's sheet sets the events, pictures and sources, and the school sets the rules on AI tools.
- It reads from the back of the room.If a label is hard to read, cut words, not font size.
Three ready requests to paste into NOXI
To have the page made for you, paste one of these into NOXI and replace the words in brackets. The bracketed samples come from the fictional bakery and wedding above.
Two slides for [Harbor Lane Bakery]'s website relaunch, version of [4 January 2027]. Slide 1: a project timeline on one horizontal line with five phases: Discovery [4 to 15 January], Design [18 January to 5 February], Build [8 February to 5 March], Test [8 to 19 March], Launch [22 to 26 March, site live Tuesday 23 March], a diamond for each sign-off and a today marker. Slide 2: the same plan as a Gantt-style table, tasks as rows, weeks as columns, owners in the first column.
A landscape one-page history timeline for a grade 8 class: votes for women in the United States, 1848 to 1920, drawn to scale with a tick every ten years and a zoom box for May 1919 to August 1920. Use only dates from the US National Archives and the National Park Service, keep each source on the page, and leave a blank field for any date you cannot confirm. Eight or nine events, labels under ten words.
A one-page run of show for [our wedding] on [Saturday 12 June 2027] as a vertical timeline with four columns: time, what happens, where, who leads. Here are the times: [paste your list]. Highlight the ceremony, write times as 1:30pm, midday and midnight, and put [name and phone] at the top as the contact on the day. Keep it plain enough to edit in Word.
Make it in NOXI: a timeline page in one request
NOXI 2.0 makes 14 formats from one request. A timeline fits two: Presentation, for a timeline slide or a deck, and One-pager, for a single page to print or send. NOXI sketches every page first (cover, key number, chart, table, timeline, quote), then writes several pages at once. It is free to start: the free plan covers five documents a month, and every change after that, by chat or by hand, is free. No credit card is needed to start, and downloads carry no watermark, on the free plan too. The full list of formats is in the NOXI 2.0 launch article.
Step 1. Open NOXI and choose Presentation or One-pager
Go to noxi.ai and sign in, or create a free account. On Home, choose Presentation for a timeline slide or deck, or One-pager for a single page. The format is a starting point, and a clear request wins.
Step 2. Paste one request with your dates and events
Paste Prompt 1, 2 or 3 with your own dates, events and owners. If you have them, attach your project plan or notes, and NOXI builds from them. When the subject needs current facts, NOXI searches the live web first and keeps each fact's source on the page.
Step 3. Let NOXI sketch, design and check the pages
NOXI picks a style that fits your subject from a design library of more than ninety styles and designs the timeline in it. Then it reads the document through, fixes what does not agree, such as a date that changed between pages, and checks for cut-off text, overlaps and tiny labels. When a fact cannot be confirmed, it leaves a clear field for you to fill.
Step 4. Edit by chat or by hand
Select a page and say what should change, such as "make slide 2 a timeline" or "move the launch to Thursday 25 March", and NOXI changes only what you asked. Or click a label and type over it. Switch the page size to landscape or 16:9 in the Design panel for a long line. Every change can be undone.
Step 5. Export to PowerPoint, PDF or Word
PowerPoint keeps editable text boxes, PDF keeps selectable text and clickable source links, and Word gives editable pages for a run of show the venue can change. Each file is compared with the pages before the download appears. To show it instead, present full screen or share a view link.
Frequently asked questions
- What is a timeline template?
- A timeline template is a ready layout that places events in date order along a time axis, with a short label for each and a scale that shows how far apart they are. You replace the sample dates and labels with your own. Common layouts are project, Gantt-style, milestone, roadmap, history, biography, comparison, vertical, school and event day.
- How do I make a timeline template in Word?
- Click Insert, SmartArt, choose the Process category and pick Basic Timeline or Circle Accent Timeline, then type your dates into the placeholders or the Text Pane. Add events with Add Shape Before or Add Shape After on the SmartArt Design tab. For a long list or a run of show, a two-column table of dates and events works well.
- Is there a timeline template in PowerPoint?
- Yes. PowerPoint's SmartArt gallery has timeline layouts: on the Insert tab, choose SmartArt, then Process, then Basic Timeline or Circle Accent Timeline. Microsoft also suggests Accent Process for a progression and Continuous Picture List for a timeline with photos. New presentations open at 16:9, which suits a horizontal timeline with a handful of events.
- How do I make a timeline in Google Docs?
- Use a drawing or a table. Click Insert, Drawing, New, then add a line or an arrow, a shape for each event and text boxes for the labels. For a vertical timeline, insert a two-column table with dates on the left and events on the right, which is quicker to edit and prints cleanly on one page.
- What is the difference between a timeline and a Gantt chart?
- A timeline shows events at points in time: what happened or will happen, and when. A Gantt chart shows tasks as bars with a start and an end, usually with owners and dependencies, so you can see which work overlaps. Use a timeline to tell a story or show milestones, and a Gantt chart to run a project.
- How many events should a timeline have?
- There is no official number; it depends on the space. As a working rule, keep a slide to about five to eight events with labels of three to eight words, a printed page to about fifteen, and move longer lists to a vertical timeline. If events crowd together, redraw that stretch in a zoom box instead of shrinking the text.
- Should a timeline be horizontal or vertical?
- Horizontal suits slides and posters, because the space runs left to right and the reader takes in a handful of events at once. Vertical suits documents, web pages and phones, where the reader scrolls down and each entry can hold a full sentence. Choose horizontal for a few events and vertical for long lists or hour-by-hour schedules.
- How should I write dates on a timeline?
- Pick one format and keep it everywhere. The GOV.UK style guide writes dates as 4 June 2017, with no ordinal and no comma, uses "to" in ranges instead of dashes, and writes times as 5:30pm, midday and midnight. Give each date only as precisely as your source does, and name the time zone when events cross days.
- What should a timeline for a school project include?
- A title with the topic and the years, six to ten events in date order, each with a date, a short label and a picture or one sentence of detail, a stated scale, and a list of sources. Follow the teacher's sheet first. Younger children can start with a timeline of their own life, from birth to today.
- Can NOXI make a timeline for me?
- Yes. Choose the Presentation format for a timeline slide or deck, or One-pager for a single page, and send one request with your dates and events. NOXI sketches the pages, designs them in a style from its library and lets you edit by chat or by hand. Export PowerPoint, PDF or Word. The free plan covers five documents a month.
Sources & methodology
Every historical date, rule and product step comes from its publisher's own page, opened on 9 November 2026, signed out. Gaps between dates and the Apollo 11 flight time are our arithmetic from those dates. The ten layouts, the event counts and the label lengths are editorial working rules, not published standards; a teacher's sheet or a company's own template always wins. Companies, people and events marked fictional are invented for the examples.
- [1] A Chart of Biography, "published by Priestley in 1765", with "approximately 2,000 poets, artists, statesmen, and other famous historical figures" plotted "along a horizonal line divided into ten-year increments"; it "is considered to be the first modern timeline" · National Endowment for the Humanities, Humanities magazine, Spring 2024, article on Joseph Priestley's charts of time, checked 9 November 2026.
- [2] The First Women's Rights Convention, held at the Wesleyan Chapel in Seneca Falls, New York, on July 19 and 20, 1848; "68 women and 32 men signed the Declaration of Sentiments" · National Park Service, Women's Rights National Historical Park, The First Women's Rights Convention, checked 9 November 2026.
- [3] The amendment was first introduced in Congress in 1878; New York adopted woman suffrage in 1917; the House passed it on May 21, 1919, and the Senate two weeks later; "Passed by Congress June 4, 1919, and ratified on August 18, 1920"; Tennessee was the 36th state to ratify; Secretary of State Bainbridge Colby certified the ratification on August 26, 1920 · US National Archives, Milestone Documents, 19th Amendment to the U.S. Constitution: Women's Right to Vote (1920), checked 9 November 2026.
- [4] "On Oct. 4, 1957, the Soviet Union inaugurated the Space Age with the launch of Sputnik"; Explorer 1 launched from Cape Canaveral on Jan. 31, 1958; the race led to "landing the first men on the Moon" 12 years after Sputnik · NASA History, 65 Years Ago: Sputnik Ushers in the Space Age, checked 9 November 2026.
- [5] "The 16:9 widescreen setting is the default value for new presentations"; Widescreen is 13.333 in x 7.5 in (33.867 cm x 19.05 cm) · Microsoft Support, Change the size of your slides, checked 9 November 2026.
- [6] Insert, SmartArt, Process, then Basic Timeline or Circle Accent Timeline (Windows) or Basic Timeline (Mac); Add Shape Before or After on the SmartArt Design tab, with Move Up or Down on Windows and Move Before or After on a Mac; Accent Process and Continuous Picture List named as alternatives; applies to Excel, Word, Outlook and PowerPoint for Microsoft 365, 2024 and 2021 · Microsoft Support, Create a timeline, checked 9 November 2026.
- [7] Insert, Timeline, select the data range, OK; "you must have at least one column of data in date format"; settings ask for card title, start date and end date; card group puts cards on the same row by a column's value; eligible Google Workspace editions are listed on the page · Google Docs Editors Help, Create and edit a timeline view (Google Sheets), checked 9 November 2026.
- [8] Insert, Drawing, New, with shapes, lines, arrows, text boxes and images; Insert, Drawing, From Drive inserts a linked drawing that Update refreshes · Google Docs Editors Help, Learn how to use drawings and markups, checked 9 November 2026.
- [9] "At the top, click Insert" and then Diagram; "Choose your style, number of levels, and template" · Google Docs Editors Help, Insert and arrange text, shapes, diagrams, and lines, checked 9 November 2026.
- [10] Key Stage 1: pupils "should know where the people and events they study fit within a chronological framework", and study "changes within living memory"; Key Stage 2: "a chronologically secure knowledge and understanding of British, local and world history". Statutory guidance, published 11 September 2013 · Department for Education, National curriculum in England: history programmes of study, checked 9 November 2026.
- [11] Dates: no ordinals, no comma between month and year, truncated months only where space is an issue, "use 'to' in date ranges and not hyphens, en rules or em dashes", months rather than quarters ("Jan to Mar 2013"); times: 5:30pm, midday, midnight, "10am to 11am" · GOV.UK, A to Z style guide, checked 9 November 2026.
- [12] Yuri Gagarin in space on April 12, 1961; Alan Shepard's first American spaceflight on May 5, 1961; John Glenn the first American to orbit the Earth on Feb. 20, 1962, on the three-orbit Mercury-Atlas 6 mission · NASA History, 60 Years Ago: John Glenn, the First American to Orbit the Earth aboard Friendship 7, checked 9 November 2026.
- [13] Shepard's suborbital flight in Freedom 7 on May 5, 1961, "a flight of 15 minutes 22 seconds"; Gagarin "completed a single orbit around the Earth" · NASA, 60 Years Ago: Alan Shepard Becomes the First American in Space, checked 9 November 2026.
- [14] Valentina Tereshkova "launched into space June 16, 1963, aboard Vostok-6" and "circled the Earth 48 times"; Sally Ride the first American woman in space on June 18, 1983, aboard Challenger on STS-7 · NASA History, Sally Ride, First American Woman in Space, checked 9 November 2026.
- [15] Aleksei Leonov's world's first spacewalk from Voskhod 2 on March 18, 1965; Edward H. White's Gemini 4 spacewalk on June 3, 1965 · NASA History, Space Station 20th: Spacewalking History, checked 9 November 2026.
- [16] Launch July 16, 1969, 9:32 a.m. EDT; lunar orbit at about 75 hours 50 minutes; undocking at 100 hours 12 minutes; descent braking until about 102 hours 45 minutes; first step at about 109 hours 42 minutes, Aldrin about 20 minutes later; EVA ending at 111 hours 39 minutes; 21 hours 36 minutes on the surface; ascent at 124 hours 22 minutes; docking at 128 hours 3 minutes; trans-Earth injection began July 21; splashdown July 24, 1969, 12:50 p.m. EDT; recovery ship USS Hornet · NASA, Apollo 11 Mission Overview and NASA, Apollo 11 mission page, checked 9 November 2026.
- [17] Born Aug. 26, 1918, White Sulphur Springs, West Virginia; graduated with highest honors in 1937; West Area Computing section headed by Dorothy Vaughan; hired by NACA June 1953; trajectory analysis for Shepard's May 1961 Freedom 7; Glenn asked for her to check the orbital calculations in 1962; retired in 1986 after 33 years; Presidential Medal of Freedom in 2015 at 97; died Feb. 24, 2020 · NASA Langley, Katherine Johnson Biography, checked 9 November 2026.
- [18] "legislators passed the Wyoming Suffrage Act of 1869"; "When the territory became a state in 1890, women retained the right to vote" · National Park Service, Wyoming and the 19th Amendment, checked 9 November 2026.
- [19] Success Criterion 1.4.1 Use of Color (Level A): "Color is not used as the only visual means of conveying information" · W3C, Understanding WCAG 2.2, Use of Color, checked 9 November 2026.



